The existing brick and timber surfaces will be the final finishes. These have been repaired and broadly complete.

A three-metre long reinforced concrete lintel has been cast to allow a new internal opening to be made into the proposed dining room. Plywood shuttering has been used to impart the grain of the timber into the concrete.

Floor levels have been adjusted ready for the insulation, underfloor heating and polished concrete floor finish.

We are now ready for the glazing.